We have just been asked back to a property in Edgware London to complete Stage two of works. The job was to overhaul the Master bedroom with Dressing room area and the final phase to Hallway.

Our first job was to strip all the walls, again this exposed the original plaster works. Once completed we had to fill all sections to made good of any blemishes and fix broken plaster sections, when perfected we smoothed out the surfaces using our Festool sanders and dust extractors. The next stage involved sanding all woodwork, and again we used our Festool equipment.

With this done we gave the celings two coats of Johnstones Covaplus Vinyl Matt, ‘Brillant White’ then applied the top coats of paint to the woodwork, we used a Farrow & Ball ‘Oxford Stone’ Eggshell and between coats we offered a light sand to give it that extra smooth finish.

The final stage involved hanging the wallpaper to all wall sections and used a durable washable vinyl wallpaper which also included a Feature wall, you can see this in the images below

Our clients were very happy with the end result, please view our photos below

20170920_151215

Strip all walls and remove existing radiator grills.

20171124_124909

Hallway wallpaper completed, new radiator cover installed and fully painted.

20170927_133339

Fully prepare walls and fix sections, sand and wash woodwork.

20171009_133208

Hallway wallpaper completed and all shelving installed and painted.

20171124_091137

Dressing room area walls prepared.

20171124_122033

Walls completed and arch fully wallpapered.

20171122_135917

Master bedroom walls prepared, woodwork sanded and washed.

20171123_145721

Master bedroom finished with feature wallpaper and all woodwork painted.

Preparation
Decoration
Clean up