We have recently finished a job in Southgate London. Our mission was to strip existing woodchip paper from the ceilings in two rooms and completely remove wall and ceiling paper in a third room ready for re-plastering.

Once prepared our next task was to re-decorate four rooms which included all ceilings, walls and all woodwork. The same work was carried out to the hallway on two floors.

The work was completed using our Festool extraction equipment which kept dust down to a minimum, this provided us with the perfectly keyed working surface to get the super smooth finish we wanted.

Below you will see examples of progress and end result images.

20171205_132800

Walls and ceiling stripped, sanded and PVA ready for plastering.

20171212_093910

Walls and ceiling plastered.

20171220_084733

Walls and ceiling painted using ‘pure brillant white’. All woodwork painted using Dulux eggshell.

20171205_132750

Angle 2

Walls and ceiling stripped, sanded and PVA ready for plastering.

20171212_093628

Angle 2

Walls and ceiling plastered.

20171220_084209

Angle 2

Walls and ceiling painted using ‘pure brilliant white’. All woodwork painted using Dulux eggshell.

20171214_121046

Walls and ceilings prepared, carpet removed. All woodwork undercoated.

ro90dx-g1

All walls, ceilings and woodwork prepared and keyed using our Festool sanders and extractors.

20171221_145624

Walls and ceilings painted using Farrow and Ball ‘White tie’. All woodwork finished using Dulux eggshell.

20171214_121101

Angle 2

Walls and ceilings prepared and carpet removed. All woodwork undercoated.

Festool-RTS-400-REQ-574634_dd77411f-2308-41b8-bfae-9410b6f53df4

Angle 2

All walls, ceilings and woodwork prepared and keyed using our Festool sanders and extractors.

20171221_144916

Angle 2

Walls and ceilings painted using Farrow and Ball ‘White tie’. All woodwork finished using Dulux eggshell.

20171213_134331

Hallway upstairs

Walls and ceilings prepared and carpet removed. All woodwork undercoated.

Festool_584032

Hallway upstairs

All walls, ceilings and woodwork prepared and keyed using our Festool sanders and extractors.

20171220_083121

Hallway upstairs

Walls and ceilings painted using Farrow and Ball ‘White tie’. All woodwork finished using Dulux eggshell.

20171220_085328

Doors sanded, filled and coated using ‘Rustins’ clear varnish.

20171213_134447

Sash window undercoated and finished using Dulux eggshell.

20171207_133137

Master bedroom finished. Ceiling using ‘pure brilliant white’. Walls finished using Farrow and Ball ‘Ammonite’. All woodwork finished using Dulux eggshell.

Preparation
Decoration
Clean up